Original poster: "Virtualgod" <mike.marcum@xxxxxxxxxxxx>
Is there any way to get more juice from the power co. or dedicated
generators? If I recall the experimental fusion reactor in Maryland (?)
eats 30MW+, even tho they have to give the power company a heads up
before they flip the switch. So how much power would it eat at the Zsec limit?
Mike
----- Original Message ----- From: "Tesla list" <tesla@xxxxxxxxxx>
To: <tesla@xxxxxxxxxx>
Sent: Friday, December 03, 2004 9:56 AM
Subject: RE: The 1500t secondary myth (long)
Original poster: Greg Leyh <lod@xxxxxxxxxxx>
Hi Steve,
As it turns out, other factors limit ALF's size before the Zsec drops too
far.
At present, the Zsec for the ALF is 38.8kOhm per tower [1186mH at 5200Hz.]
Site power is the principal limitation, at just under 8MW. Hopefully the
energy
recovery scheme will provide some extra margin here.
-GL