[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: winding the primary?
In a message dated 8/31/00 4:51:17 PM Pacific Daylight Time, tesla-at-pupman-dot-com
writes:
<< hi all,
>
> i am winding my primary and it is really starting to hack me off! i am
using
> 1/4in od copper tube. it is a pancake coil that is 9 turns and it wont
stay
> in place does anyknow "the KEY" to getting a perfet primary? i have seen
> some real nice ones and i just cant see how. some say just work
> slowly...well that dount seem to work i haev spent more time on the
primary
> then i spent winding the secondary.
>
> also i am looking for a varic ya i have seen them for sale but ya know $$
is
> always a issue and they are likr 160 dollers does that seem right? does
> anyone know how i can optian one for cheaper or is this as cheap as they
> come?
>
> thanks alot,
>
> MIKE
> >>
Mike,
Here is how I do it.
I used .25" thick clear acrylic. I bought some scraps from a local plastics
shop and the necessary glue to put it all together. I used a large flat
piece for the bottom with the center cut out to clear the secondary - I used
a 7.0" diameter hole here. Then I made 4 pieces about 2.0" wide and as long
as necessary and drilled 3/8" dia holes down the center in a row with each
hole .75" apart. Then I cut these in two pieces down the center (with a band
saw) which yields 8 mounting pieces with notches to hold the tubing in. Then
I drilled 1/8" dia holes under each notch so I could hold the tubing in place
with plastic wire ties. Now I marked the base where the 8 supports would go
(45 degrees apart). Now figure out where to mount the first one so you will
have 1.5" clearance from the secondary coil and glue it in place. Mount the
next support with the first notch located back about .09" (.75" / 8) from the
first one. Keep doing this as you go around so as the tubing is laid in, it
will form a natural spiral with the next notch (or tie down location being
out a little from the last one) so you gain .75" in one revolution. I cut
the supports off about .25" from the notch on the inside and left about 2.0"
extra on the outside so you have some place to mount some small uprights to
mount the strike rail on. Once I got all the supports mounted, I cut out
most of the plastic in between them so you have space to bring the primary
tap lead up from underneath. This is mounted on a roll around cart that has
3/4" plywood mounted on the top and cutouts to match the primary base.
Now to lay the copper tubing in place - I start by supporting a flat board up
above the coil form (about 3 or 4 feet up so you have room to work under it).
Lay the coil of tubing on the board and set a full gallon bucket of paint or
something else round and heavy in the center of the coil of tubing to keep
the coil of tubing from falling on your head. Figure out how much tubing you
want to go down from the innermost turn into the primary connections below
and use a copper tubing bender (looks like a spring and cost maybe $2.50) to
bend a tight corner there and lay the tubing into the first notch with the
extra foot or two pointing straight down (to make it easier to work since you
will be constancly rotating the base at this point, you might just fold this
piece under the base and straighten it out later). You can also start with
just a short piece pointing down here and solder an extension on it later.
Work the tubing into place, the natural coil of the tubing will help. It
really doesn't require much bending at all. I worked one layer into place
and then started tying the plastic wire ties into place at each notch to hold
it. If you keep the tubing basically in place about one revolution ahead of
the notch you are currently tying, it works pretty smooth. After I got a
couple of turns tied in place I used a 3/8" diameter drill bit to check to
make sure I had even spacing between turns. This will take several hours and
make your back sore but it will look great when you are done. I used two 50
foot coils of tubing and spliced them together right on the form as the first
coil was used up. Find a smaller piece of tubing that just fits into the
tubing you are using, cut a piece about 3/8 to 1/2" long and use this piece
to hold them together as you solder them. Wipe off with a dry towel when the
solder is still wet and clean up with steel wool and you won't even be able
to find the splice.
Good luck and have fun, Ed Sonderman