[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: OBIT test Problem (fwd)



---------- Forwarded message ----------
Date: Mon, 22 Oct 2007 13:18:25 +0000
From: "Lau, Gary" <Gary.Lau@xxxxxx>
To: Tesla list <tesla@xxxxxxxxxx>
Cc: "Mddeming@xxxxxxx" <Mddeming@xxxxxxx>
Subject: RE: OBIT test Problem (fwd)

Hi Matt:

I understand your point, but I can't make any sense out of the data you attached.  The formatting must be horribly mangled; it's unclear how many columns there should be for each section and what the headings are.  Can you resend with blank lines between data lines, or send it to me off-list as a properly formatted html message?

I didn't follow why you multiplied the reverse-hookup measurements by 100.  Where did the 100 factor come from?

Thanks, Gary

> From: Mddeming@xxxxxxx
> To: tesla@xxxxxxxxxx
> Cc: Mddeming@xxxxxxx
> Subject: OBIT test Problem
>
> Hi All,
>
> I was running some tests today on a 10 kV, 23 mA OBIT I picked up for $1.00
> at a yard sale.
>
> First I powered it with 0 to ~140 V on the HV side and read the LV  side. I
> then multiplied both readings by 100 which I thought would give me  fairly
> representative response curve for the transformer.
>
> I then applied 0 to ~ 60 V on the low voltage side and read the  HV side my
> trusty Triplett 630-A meter, which has a built in 0-6000 VAC  scale , and
> compared the results to the first test. NOT EVEN CLOSE!
> (See results below) what am I missing?
>
> Matt D.
>
> Reverse test Raw Data
>
>        V in V out Ratio      0 0   4.24 0.0292 145.20548  10.61 0.0804
> 131.96517  15.58 0.1233 126.35848  20.55 0.1678 122.46722  25.5 0.2132
> 119.60600
> 29.6 0.2538 116.62727  34.71 0.2995 115.89316  41 0.3604 113.76249  45.1 0.389
> 115.9383  50.8 0.442 114.93213  55.9 0.492 113.61789  60.9 0.54 112.77778  65.1
> 0.58 112.24138  69.8 0.627 111.32376  75 0.676 110.94675  80.8 0.735
> 109.93197  84.9 0.774 109.68992  90 0.825 109.09091  95.3 0.877 108.66591
> 100.8 0.931
> 108.27068  105.4 0.977 107.88127  110.8 1.031 107.46848  114.6 1.069
> 107.20299  120.2 1.125 106.84444  124.7 1.169 106.67237  131 1.23 106.50407
> 136.7
> 1.287 106.21601  141.5 1.336 105.91317  148.5 1.408 105.46875
>
>
>
>           Projected Results   Actual Forward Test  V in V out Ratio  V in V
> out Ratio          0 0   0 0   2.92 424 145.205479  4.65 350 75.26882  8.04
> 1061 131.965174  8.48 650 76.65094  12.33 1558 126.358475  12.33 950
> 77.04785
> 16.78 2055 122.467223  16.73 1300 77.70472  21.32 2550 119.606004  20.72
> 1620
> 78.18533  25.38 2960 116.627266  25.15 2000 79.52286  29.95 3471 115.893155
> 30.06 2400 79.84032  36.04 4100 113.762486  35.33 2900 82.08322  38.9 4510
> 115.938303  40.6 3390 83.49754  44.2 5080 114.932127  45.2 3910 86.50442
> 49.2 5590
> 113.617886  50.3 4230 84.09543  54 6090 112.777778  55.65 4690 84.27673  58
> 6510 112.241379  60.8 5110 84.04605  62.7 6980 111.323764  65.5 5510
> 84.12214
> 67.6 7500 110.946746  71.7 6000 83.68201