Hi Dan,
The gate drive boards should get here Thursday (last big part). They are
simple so they should go ok... From there it is just a matter of wiring,
crimping, and bolting all these sub-parts together. There is a fan
bracket, controller mount, and a few other "machined" things that tend to
take a lot of time but I can hopefully sneak them into dull
moments... Lots of low power testing to bring each system up... I will
drive just a LCR "fake" primary system at first... The caps all came in
from Rell.com too but the main MMC for the "real coil" is just a "pile of
caps" right now...
I think two to three weeks out... I think I need to order stuff for the
MMC from McMaster and of course three more orders form DigiKey as is the
norm ;-)) If something blows, that adds a week...
Slooow isn't it... But it "has" to take all winter ;-))
Cheers,
Terry