[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

48kW DRSSTC: start date



Original poster: "Hooper, Christopher AZ" <christopher.az.hooper@xxxxxxxxx>



Good day great coilers,

My goal is to start the 48kwatt DRSSTC in March of 2006. Dave (D&M high
voltage) is busy looking for the Secondary form, I found big SCR
controllers (three) at the Ham Fest Sat. (Arizona) and Dr. Hankenstein
is busy working on his high Voltage lab with at least a 200 amp feed.
Only issue is I can not sleep, dreaming on how to mount an 8 foot top
hat on a 10 foot secondary,

Goal- 25 foot sparks, no transformers, no variac's, just pure solid
state (well a little transformer for the logic).

Rgs,
Christopher robin

Project Personal:

Manager/$$$ - Christopher Robin (DR. Spark @
http://users.cableaz.com/~chooper/

Product Development Engineer - Steve Ward @ http://www.stevehv.4hv.org/

High Power Engineer and house for DRSSTC - Dr. Hankenstein @
http://hot-streamer.com/temp/IMG_1318.JPG

Hardware developer -  Dave @ D&M high voltage at @
http://home.netcom.com/~davmckin/DMsIndex.htm