[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Putting two potential transformers in series



Original poster: ashumate3-at-aol-dot-com 

Here is something that should be considered. The windings of HV Xfmrs are 
rated at 2 and 1/2 time the voltage. Putting 2 xfmrs at 7.2 kv in series 
means that the insulation should be rated at 2 and 1/2 times 14.4 kv. The 
voltage rating of winding of both primary and secondary is the same because 
of buck and boost possibilities of xfmrs. The original writer did not 
indicate if the PT's were used or not.

BIL rating is not ment to be continous rating. It is there for transient 
voltages and some protection from lighting.

In order to determine if the xfmrs will be safe at 14.4 kv a HiPot test 
should be performed at 2 and 1/2 time the highest voltage

Al Shumate