[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Proper sheathing of the HV power lines/ was: How many STSG's in service?
Original poster: "by way of Terry Fritz <twftesla-at-qwest-dot-net>" <Tesla729-at-cs-dot-com>
In a message dated 11/26/01 9:35:33 AM Central Standard Time, tesla-at-pupman-dot-com
writes:
>
> I was contemplating a similar arrangement. Did you run both HV leads through
> the same conduit or did you pass each HV lead through its own conduit? This
> would would yield 3 cables, 2 for the HV and 1 for the 120 v leads.
>
> Steve in Iowa
Steve,
No, actually I ground out one side of the pole pig's HV
bushings and connect the grounded HV bushing to the
outer Romex sheathing. So, I end up with only two
sheathed cables running from the control panel to the
coil: one for the "Hot" HV lead and the other for the
120 VAC cable running from the control panel to the
RSG motor in the coil.
David in Memphis, TN.