[Prev][Next][Index][Thread]

Tesla Coil Videotape #19




----------
From:  chris.swinson [SMTP:chris.swinson-at-zetnet.co.uk]
Sent:  Thursday, August 20, 1998 4:33 PM
To:  Tesla List
Subject:  Re: Tesla Coil Videotape #19





-----Original Message-----
From: Tesla List <tesla-at-pupman-dot-com>
To: 'Tesla List' <tesla-at-pupman-dot-com>
Date: 20 August 1998 06:13
Subject: Tesla Coil Videotape #19


>
>
>----------
>From:  FutureT-at-aol-dot-com [SMTP:FutureT-at-aol-dot-com]
>Sent:  Wednesday, August 19, 1998 12:39 PM
>To:  tesla-at-pupman-dot-com
>Subject:  Tesla Coil Videotape #19
>
>All,
>
>Newer list members may not have seen my 9/9/97 ad for my Tesla coil
>videotape #19.  This tape covers the construction and testing of
>the 12kV, 30ma NST powered, 42" spark TC, break rate comparisons,
>vacuum tube magnifiers, small demo coil, quench times explored, etc.
>
>Complete index below:
>
>1.  Hamfest buy: special ignition transformer
>2.  Vacuum tube magnifier; variable tuned secondary
>3.  Quench times explored using a transistor instead of SG, scope
>     displays
>4.  4uS quench times using a spark gap Tesla coil
>5.  Coupling is tightened, quenching observed
>6.  Low frequency system; comparison of quenching
>7.  Offset electrodes discussed (rotary gap) (some of this is later
>     invalidated)
>8.  Quench times compared on low frequency coil
>9.  New system quenches at 1st notch at k = .22
>10.  Tighter coupling is tested
>11.  New staccato control for tube coils is tested
>12.  100 megawatt hydrogen thyratron is shown
>13.  Compressed air quench assist is tested
>14.  Rejuvenation of vacuum tube filaments is discussed
>15.  New TC platform is constructed
>16.  New TC is shown and described
>17.  12kV, 30ma neon sign transformer gives 42" sparks using sync
>       gap
>18.  15kV, 60ma NST is used which requires a rotary sync gap
>       modification, gives 65" sparks with first notch quenching
>20.  Higher break rates are tested using modified non-sync rotary
>21.  Variac tested as ballast
>22.  10 kilowatt multi-range wattmeter is installed
>23.  Potential transformer efficiency compared with neon transformer
>24.  Improved joining method for dryer duct toroids
>25.  Photos from 1996 TCBOR Teslathon
>26.  Series rotary quenches similarly to regular rotary
>27.  Ballast is shown and discussed
>28.  Higher break rate gives minimal improvement, and lower efficiency
>29.  Hamfest buys; caps, misc
>30.  Garbagefests described
>31.  Potential transformer versus neon transformer, efficiency compared
>32.  7.5kV, 120ma neon transformer is tested on TC
>33.  Neon transformers are obtained from distributer
>34.  Small stylish, easy to build, demo-type TC is built and described
>35.  Gaithersburg hamfest buys
>
>To order tape #19 (108 minute run-time)  please send $17 to:
>
>John Freau
>49 Thiem Ave
>Rochelle Pk,   NJ   07662
>
>Thank you,
>John Freau
>
>
>
>
>

Is this tape NTSC or PAL, Normal UK players as PAL.  Though my video will
both ( thank god , after a big order of tesla tape ).